Apply Online for New Domestic Gas Connection 2025: SNGC LNG & Meter Registration Guide

Apply Online for New Domestic Gas Connection 2025: SNGC LNG & Meter Registration Guide. Are you planning to get a new domestic gas connection in 2025? The Sui Northern Gas Pipeline Limited (SNGPL) has introduced a major update: all new residential connections will now be under LNG (Liquefied Natural Gas). Whether you’re applying for the first time or had an old application pending, this guide will walk you through the entire online application process, required documents, updated fees, and priority registration system, ensuring a smooth connection under the new policy.
What’s New in SNGPL Domestic Gas Connections?
In 2025, SNGPL has shifted its domestic gas connection policy completely towards LNG-based connections, making traditional natural gas applications obsolete. Here’s what you need to know:
- All previously submitted applications are now cancelled.
- Manual or in-person submissions are no longer accepted.
- A separate portal exists for applicants with prior demand notices.
- Updated fee structure based on property size and urgency.
- Mandatory submission of neighboring household gas bill for verification.
Online-Only Application Process for LNG Connections
To make the process transparent and efficient, SNGPL requires all applications to be submitted online.
Steps to Apply Online:
- Visit the official SNGPL online portal: SNGPL LNG Online Application
- Select your connection type (Domestic LNG)
- Fill in personal details, property information, and CNIC data
- Upload required documents (explained below)
- Submit your application and note your reference number for tracking
Required Documents for LNG Domestic Connection
SNGPL has specified a strict document checklist for LNG connection applications. Ensure you attach:
Document | Purpose | Notes |
---|---|---|
Valid CNIC | Identity verification | Must be original and active |
Property ownership proof | Confirms residence eligibility | Utility bill, property deed, or NOC |
Neighboring household gas bill | Area infrastructure verification | Recent bill to confirm pipeline availability |
Photographs (optional) | For meter installation | 1–2 recent photos may be required |
Priority Processing for Previously Issued Demand Notices
If you had received a demand notice before this policy update, SNGPL offers priority processing:
- You do not need to resubmit all documents.
- Use the designated portal for prior demand notice holders.
- Applications under this category are processed faster to avoid delays.
Tips for Old Applicants:
- Check the official SNGPL website for the correct portal link.
- Ensure your CNIC and property details match prior submissions.
- Monitor your application status online regularly.
Category Change: From Natural Gas to LNG
Previously, residential connections could be requested for natural gas. Now:
- All new domestic connections are LNG-based
- Traditional natural gas requests are obsolete
- Previously submitted applications for natural gas are invalid
Why the Shift to LNG?
- Rising energy demand in urban areas
- Efficient and environmentally friendly liquefied natural gas supply
- Simplified monitoring and billing system
New Fee Structure for LNG Demand Notices
SNGPL has revised its fees to reflect property size and urgency.
Property Size | Standard Fee (PKR) | Urgent Processing Fee (PKR) |
---|---|---|
Up to 5 Marla | 21,500 | 25,000 |
Up to 10 Marla | 23,500 | 27,000 |
Urgent Requests | N/A | 25,000–27,000 |
Note: Urgent applications are processed faster but come with a higher fee.
Step-by-Step LNG Meter Registration Process
After your application approval, the LNG meter registration is the next crucial step:
- SNGPL technician schedules an on-site visit.
- Verify CNIC and property ownership again.
- Install LNG meter and connect the pipeline.
- Activate the meter with initial gas flow.
- Record meter reading for billing system.
Tips for New Consumers:
- Ensure the property is accessible for meter installation.
- Keep copies of previous bills handy for verification.
- Confirm neighboring pipeline connectivity for proper gas flow.
Common Issues & Solutions
1. Old Application Cancellation:
All previously submitted natural gas applications are invalid. Solution: Apply again under the LNG portal.
2. Missing Documents:
Incomplete submissions are rejected. Solution: Double-check CNIC, property documents, and neighbor’s gas bill.
3. Urgent Connection Delays:
High demand may affect urgent applications. Solution: Submit with urgency category and track your application online.
4. Confusion with Demand Notices:
Consumers often mix old and new portals. Solution: Always use the correct link based on application status.
Benefits of LNG-Based Domestic Gas Connections
- Environmentally Friendly: Reduced carbon emissions compared to conventional gas.
- Efficient Supply: Reliable flow even in high-demand urban areas.
- Online Tracking: Monitor application and meter activation easily.
- Standardized Billing: Transparent and predictable monthly bills.
FAQs
Q1: How can I apply online for a new domestic gas connection 2025?
A1: Visit the official SNGPL portal and submit your LNG-based application along with required documents.
Q2: What documents are required for SNGPL LNG connection?
A2: Valid CNIC, property ownership proof, recent gas bill of a neighboring household, and optional photographs for meter registration.
Q3: Are previous natural gas applications valid?
A3: No. All prior natural gas applications are cancelled. You must apply again under the LNG category.
Q4: How much is the fee for new domestic LNG connections?
A4: Fees start from PKR 21,500 for houses up to 5 marla and increase based on property size or urgent processing requests.
Q5: How long does it take to get the LNG meter installed?
A5: Usually within 7–14 working days after your online application is approved, depending on demand and area infrastructure.
Conclusion
Applying for a new domestic gas connection in 2025 has never been easier, thanks to SNGPL’s online LNG application system. By following the updated process, submitting all required documents, and understanding the new fee structure, you can secure your gas connection efficiently and avoid unnecessary delays.